Hilda being installed – week commencing 13 Nov 2017
Hilda being installed Week commencing 13 November 2017 was a real milestone for Henstone Distillery as our still, Hilda, was installed. We all worked long hours but the end result...
Hilda being installed Week commencing 13 November 2017 was a real milestone for Henstone Distillery as our still, Hilda, was installed. We all worked long hours but the end result...
Week commencing 13 November 2017 was a real milestone for Henstone Distillery as our still, Hilda, was installed. We all worked long hours but the end result was well worth it as I hope the following photographs show…
Phew, the postal address was correct!
Tim and Bob start unpacking.
It was a bit of a squeeze getting the Manitou in!!
Michael supervises the lifting of the main body of the still.
Almost there!
Hilda is gently lowered into place as Dean watches on.
Michael starts assembling her.
Unbeknown to us quite a few parts were transported in the main body of the still. Tim found it amusing as Michael tried to retrieve them.
Final bit of adjusting
The helmet is lifted into place.
Main still and hot water tank in place now.
Michael trying to work out how we’d get the column on top of the hot water tank!
Ah, we’d do it with a block & tackle and a genie (good job we have a great hire shop close by)! Note that Iain, our resident engineer and electrician, was called in to advise at this stage.
It was a struggle with not much room between the top of the column and the roof.